VC6-250-DI + DS6-250

Combined Coating & Drying Line

From unfinished timber to ready-to-ship — in one continuous motion

Request Line Configuration

The Challenge

Running separate coating and drying equipment means managing two production schedules, staging wet material between machines, and coordinating handoffs. Every transfer point is a chance for damage, delays, or quality inconsistency. Wet-coated profiles require careful handling and dedicated floor space while waiting to dry.

The Solution

The VC6 + DS6 Combined Line eliminates the gap. Material enters unfinished, moves through vacuum coating, immediately enters infrared drying, and exits ready for packaging. One operator manages the entire workflow. No staging areas, no wet material handling, no scheduling two separate processes.

Engineered for Excellence

Precision engineering meets practical efficiency

Single-Pass Complete Finishing

Material enters unfinished and exits fully coated and cured. No intermediate handling or separate drying stage required.

Synchronized Speed Matching

Coating and drying speeds are electronically matched. No bottlenecks, no queuing, no staging areas between machines.

One Operator, Full Line

Single workstation manages the entire coating-to-finish workflow. Monitor and adjust both processes from one position.

Optimized Footprint

Integrated design requires less floor space than separate machines with transfer zones and staging areas.

Technical Specification

Additional Specifications

  • System ConfigurationVC6-250-DI Vacuum Coater + DS6-250 Drying Tunnel
  • Combined Throughput7,000–10,000 linear metres/day (50mm profiles)
  • Feed Speed Range11–40 metres/minute
  • Operators Required1
  • OutputDry, finished product ready for handling

Let's Design Your Production Line

Every operation is different. We'll configure a combined line matched to your products, throughput targets, and floor space.

Request Line Configuration